Thursday, April 29, 2010

Lock Up and More!!!

There has been heaps of action at the house since the long weekend. In just two days the tradies have done the following:
  • Cleaned Bricks
  • Installed most doors
  • Installed Garage Door
  • Put up most of the cornices
  • Installed most of the skirting
  • Waterproofing
  • Termite protection
A few photos of the action below.

Close up of the garage door



Rear of the house with some termite protection



View of the kitchen area (pantry and fridge space) from the dining area



View down the hallway to the front door from leisure room



View of the walk in robe and ensuite entry from the corner of the Master Bedroom



Also spoke to the SS today. The kitchen was delivered today and should be installed tomorrow. I will then meet him and the tiler on site next week some time to confirm all the tiling details they have on file are correct.